Is it expensive to get grid connected?



Apart from the cost of employing a RECI/ECSSA certified electrician to connect the system to the grid (which will be included in the price of the system) there will typically be no additional charge from ESB Networks. However in some instances, there may be additional physical works required, and such works would be chargeable.
An import/export meter (interval meter) is required to avail of payment for export. ESB Networks is providing the first 4,000 microgenerators with free interval meters.