It is worth
pointing out that the interval meter which is available from ESB Networks is
different from the smart meter which will be piloted around Ireland in
2009/2010. The interval meter is existing technology and the smart meter will
be a new technology with new supporting infrastructure. Microgenerators are not
included in the smart metering pilot. The microgeneration field trials are
separate from the smart metering pilot.
No comments:
Post a Comment